From a staked lot
to the lights coming on.
Every Kullar home goes through the same ten stages with the same trades. This is what happens between your deposit and your keys — the homepage shows it as video, this page is the written version.
the lot
Every Kullar home starts with the ground. We walk the lot with you, set the elevations against the neighbours, and dig to bearing soil before a single form goes up.
foundation
Engineered footings, poured concrete walls, damp-proofing and weeping tile. Then it cures — properly — before anyone stands on it.
framing
Our own crews frame every home. Floors, walls and beams go up in days, with windows, doors and trusses already ordered the week the foundation cured.
lock-up
Trusses, sheathing, roofing, windows and exterior doors. The house is closed in and dry before the northern weather has a say.
rough-ins
Electrical, plumbing and heating run through the open walls — by trades who've wired and plumbed seventy-five Kullar homes. Inspected, then closed.
drywall
Spray foam and batt insulation, vapour barrier, then board, tape and mud. This is when the rooms you saw on paper start to feel like rooms.
exterior
James Hardie siding, cultured stone, soffits and the Steel-Craft garage door — in the colour scheme you picked, checked against the homes beside you.
finishes
Cabinets, quartz, tile, flooring, paint and fixtures from your selections — Rockies, Venice, Ceppo, Anthology, or a palette that's entirely yours.
outside
Concrete driveway, walkways, topsoil, sod and plantings. The last trade off site is the one that makes it look like it was always there.
home
A final walkthrough, a set of keys, a warranty, and a builder who's still around next spring. Then the next lot gets staked, and we start again.